Post From: Study Overlay Problems

[2014-10-13 10:46:50]
Glyn - Posts: 20
When the Study/Price Overlay is transferred from a Range Chart to a 1 minute chart, only a limited and variable number of transferred values are displayed on the 1 minute chart. This is resolved by a forced recalculation which allows the most recent levels to be displayed again. However, after a few more periods the transfer lines will again disappear.

For example, a study of the range bar high (using a simple moving average 1) displaced 2 periods and then transferred to a 1 minute chart, shows the problem. Also, no new overlay level is formed when a new range bar commences.

Interestingly, a non-displaced overlay continues to be drawn correctly throughout.