Support Board
Date/Time: Wed, 30 Apr 2025 10:38:22 +0000
Too Many Chart Drawings
View Count: 133
[2025-04-05 21:59:18] |
user_xyz - Posts: 475 |
Using chart drawings (text, arrows, lines etc) to mark up charts but ONLY Use Number of Days to Load is set to 10 days. If I have 12 months of drawings that have 'scrolled past' creating possibly hundreds of drawings on the chart in the Manage Drawings window will that impact performance in anyway or is it just based on Number of Days (or date range) loaded in the chart? Too Many Chart Drawings High CPU Usage | Inactive User Interface | Poor Performance | Long Time to Load Chart Data | Charts Reloading Often: 30.26 - Too Many Chart Drawings Date Time Of Last Edit: 2025-04-05 22:01:32
|
[2025-04-06 16:59:08] |
Sierra_Chart Engineering - Posts: 19383 |
Yes too many chart drawings will have a performance impact because even if they are not drawn, they are checked if they need to be drawn every time the chart is updated. Too many drawings, would be like many 100s of drawings. Even more than 100 could be a problem.
Sierra Chart Support - Engineering Level Your definitive source for support. Other responses are from users. Try to keep your questions brief and to the point. Be aware of support policy: https://www.sierrachart.com/index.php?l=PostingInformation.php#GeneralInformation For the most reliable, advanced, and zero cost futures order routing, use the Teton service: Sierra Chart Teton Futures Order Routing Date Time Of Last Edit: 2025-04-06 17:00:09
|
To post a message in this thread, you need to log in with your Sierra Chart account: