Support Board
Date/Time: Fri, 04 Jul 2025 08:51:47 +0000
Chart Calculator CV Error
View Count: 662
[2020-04-29 17:07:04] |
User98657 - Posts: 372 |
Hello, I'm using the Chart Calculator on an ES Chart (ESM20_FUT_CME). I'm measuring from 2906.50 up to 1940. The DIT is correctly shown as +134, the PD is correctly shown as +33.50, the CV however is showing +10050.00. This would of course be 75 per tick, and obviously incorrect. Chart>Chart Settings>Tick Size is set to .25 Chart>Chart Settings>Advanced Settings 2>Currency Value per Tick is set to 12.5. Global Settings>Symbol Settings> Tick Size is set to .25 and Currency Value Per Tick is set to 12.5 Before sending this I checked my CL Chart as well and found the Currency value is x3 (should be showing 800 but instead shows 2400) When I check it on a 5-Min Chart, I see a difference. My 5-Min chart shows the correct currency Value. Thoughts? |
[2020-04-29 20:41:49] |
|
This is not an error, that value is affected by the Trade Window order quantity. Set the order quantity to 1. The documentation says this here: Chart Drawing Tools: Chart Calculator Configuration Sierra Chart Support - Engineering Level Your definitive source for support. Other responses are from users. Try to keep your questions brief and to the point. Be aware of support policy: https://www.sierrachart.com/index.php?l=PostingInformation.php#GeneralInformation For the most reliable, advanced, and zero cost futures order routing, *change* to the Teton service: Sierra Chart Teton Futures Order Routing |
To post a message in this thread, you need to log in with your Sierra Chart account: