Login Page - Create Account

Support Board


Date/Time: Tue, 30 Apr 2024 18:14:05 +0000



[User Discussion] - Volume by price study request

View Count: 661

[2016-01-09 19:50:27]
JosefPetran - Posts: 7
Dear Support board,

I have added the VBP study (in the static intraday chart) and I would like to ask, if there si an utility, that can render the VPB according to how I manually shift the chart (candle after candle)and corresponds to the displayed (odly displayed) candles. All in the static form - manually shifted.:-).

Thank you very much for your answer.

BR.

Josef
[2016-01-09 19:58:35]
Sierra Chart Engineering - Posts: 104368
Yes. You just need to set the Volume Graph Period Type Input with the Volume by Price study to "Visible Bars".
Sierra Chart Support - Engineering Level

Your definitive source for support. Other responses are from users. Try to keep your questions brief and to the point. Be aware of support policy:
https://www.sierrachart.com/index.php?l=PostingInformation.php#GeneralInformation

For the most reliable, advanced, and zero cost futures order routing, *change* to the Teton service:
Sierra Chart Teton Futures Order Routing
[2016-01-09 20:13:16]
JosefPetran - Posts: 7
OK, an this is possible only with the ,,visible bars" profile? Meaning, in the volume graph period type? Do I understand it correctly?

Thank you.

Josef:-)
[2016-01-09 20:14:58]
Sierra Chart Engineering - Posts: 104368
Yes this is correct.
Sierra Chart Support - Engineering Level

Your definitive source for support. Other responses are from users. Try to keep your questions brief and to the point. Be aware of support policy:
https://www.sierrachart.com/index.php?l=PostingInformation.php#GeneralInformation

For the most reliable, advanced, and zero cost futures order routing, *change* to the Teton service:
Sierra Chart Teton Futures Order Routing
[2016-01-09 20:18:52]
JosefPetran - Posts: 7
Perfect:-). And pls, one more technical question. I operate with two types of graphs 30 min + 2 min. Into the 30 min I draw some extended rectangle + lines and the question is, if it si possible, when I draw this into the 30 min graph, can it be displayed as well in to the 2 min graph togethe at the same time of drawing?

Thank you very much for your answer.

BR.

Josef
[2016-01-10 01:12:08]
Sierra Chart Engineering - Posts: 104368
Refer to:
https://www.sierrachart.com/index.php?page=doc/helpdetails72.html
Sierra Chart Support - Engineering Level

Your definitive source for support. Other responses are from users. Try to keep your questions brief and to the point. Be aware of support policy:
https://www.sierrachart.com/index.php?l=PostingInformation.php#GeneralInformation

For the most reliable, advanced, and zero cost futures order routing, *change* to the Teton service:
Sierra Chart Teton Futures Order Routing

To post a message in this thread, you need to log in with your Sierra Chart account:

Login

Login Page - Create Account