Support Board
Date/Time: Thu, 10 Oct 2024 01:27:08 +0000
Time expansion is wrong.
View Count: 896
[2014-12-23 21:12:04] |
dem_z - Posts: 14 |
-100% to 0% should equal 0% to +100% but the duration of the former is 14m 14s, and the duration of the latter is 2d 45m 48s This chart is on ES, 1 second |
Screenshot 2014-12-23 16.08.31.png / V - Attached On 2014-12-23 21:09:57 UTC - Size: 182.17 KB - 322 views |
[2014-12-24 21:02:54] |
Sierra Chart Engineering - Posts: 104368 |
In the configuration for this drawing tool, there is the Time Analysis Based On setting which controls this. You need to set it to Time. Refer to the documentation here: https://www.sierrachart.com/index.php?page=doc/doc_Tools.html#DrawingToolConfiguration Sierra Chart Support - Engineering Level Your definitive source for support. Other responses are from users. Try to keep your questions brief and to the point. Be aware of support policy: https://www.sierrachart.com/index.php?l=PostingInformation.php#GeneralInformation For the most reliable, advanced, and zero cost futures order routing, *change* to the Teton service: Sierra Chart Teton Futures Order Routing |
To post a message in this thread, you need to log in with your Sierra Chart account: