Support Board
Date/Time: Tue, 13 May 2025 15:31:22 +0000
Time expansion is wrong.
View Count: 954
[2014-12-23 21:12:04] |
dem_z - Posts: 14 |
-100% to 0% should equal 0% to +100% but the duration of the former is 14m 14s, and the duration of the latter is 2d 45m 48s This chart is on ES, 1 second |
![]() |
[2014-12-24 21:02:54] |
|
In the configuration for this drawing tool, there is the Time Analysis Based On setting which controls this. You need to set it to Time. Refer to the documentation here: https://www.sierrachart.com/index.php?page=doc/doc_Tools.html#DrawingToolConfiguration Sierra Chart Support - Engineering Level Your definitive source for support. Other responses are from users. Try to keep your questions brief and to the point. Be aware of support policy: https://www.sierrachart.com/index.php?l=PostingInformation.php#GeneralInformation For the most reliable, advanced, and zero cost futures order routing, *change* to the Teton service: Sierra Chart Teton Futures Order Routing |
To post a message in this thread, you need to log in with your Sierra Chart account: