Support Board
Date/Time: Sat, 17 Jan 2026 23:07:07 +0000
Post From: Linked charts issue
| [2025-11-22 01:36:31] |
| cuckiecheese - Posts: 106 |
|
Hi, I've got 6 chart tabs all linked by the same number. 5 of the charts have "days to load" linked. whenever I make a change to days to load on the unlinked chart it affects and changes all of the days to load on linked charts. This does not happen the other way around (as expected). |
