In general, in order to have chart settings that are different from the default, you would need to start with a Template chart setup as you want. Refer to the following:
Using Chart Templates

There are a few items, however, that are controlled differently. The Symbol Settings, in particular, where these are setup per symbol and will update the chart whenever the symbol is changed. If you want an item that is part of the Symbol Settings, then you need to update the actual symbol settings themselves. Refer to the following:
Global Symbol Settings: Instructions

Another few items, specifically the "Days to Load", "Intraday Bar Period", and "Graph Draw Type" can be saved as specific items that will then be setup that way for any new chart. Refer to the following:
Chart Settings: Save Days to Load, Intraday Bar Period, Graph Draw Type as Default (Chart >> Chart Settings >> Chart Data >> Chart Data menu)

There is not an option to copy drawings to all other charts of the same symbol. You do need to use the "Copy Drawings to Chart #" option to do this. You can then control if a chart does not display drawings that were not from the same symbol. Refer to the following and the entry 2 below it:
Chart Settings: Copy Chart Drawings from Chart #'s (Chart >> Chart Settings >> Chart Drawings menu)
For the most reliable, advanced, and zero cost futures order routing, use the Teton service: