[2025-06-09 18:06:42]
John - SC Support - Posts: 40422
It sounds like you are asking if there is a way to do this multiplication simply - to which the answer is not really.

In the end, the best way to do this would be to use the Spreadsheet Study and have a column that is just the multiplier value you want along with columns for the lines which would be some entered value multiplied by the multiplier. Then you can change the one value to adjust the lines. Refer to the following:
Using the Spreadsheet Study
For the most reliable, advanced, and zero cost futures order routing, use the Teton service:
Sierra Chart Teton Futures Order Routing