Support Board
Date/Time: Wed, 27 Aug 2025 07:48:37 +0000
Post From: Allow Study to Change Bar Period
[2025-05-03 12:52:15] |
User139065 - Posts: 24 |
Yes, i was using the "BarPeriod.IntradayChartBarPeriodParameter1", but the the chart was not changing. ACSIL Interface Members - Functions: sc.SetBarPeriodParameters() I was able to figure it out, and now the code changes the chart bar period. There used to be a option in the chart settings that needed to be enabled to allow a study to changed the chart. I guess it was removed. |