Support Board
Date/Time: Mon, 12 May 2025 00:33:16 +0000
Post From: Extending Rectangle
[2024-09-09 19:19:47] |
John - SC Support - Posts: 39699 |
Something is not correct with the way you have your "Extending Rectangle" configuration setup. By default, the Extending Rectangle will start at the point you first select and then will extend to the right or left depending on where your second point is placed (i.e. if the point is to the left of the first point, the extension will be to the left, and if it is to the right of the first point, the extension will be to the left). It sounds like you have the option for "Use Start Time" set to "0" in the configuration you are using for the extending rectangle. This will force the first point to be at midnight (00:00:00) instead of where you actually place it. Refer to the following: Chart Drawing Tools: Rectangle | Extending Rectangle | Ellipse | Triangle Configuration For the most reliable, advanced, and zero cost futures order routing, use the Teton service: Sierra Chart Teton Futures Order Routing |