Login Page - Create Account

Support Board


Date/Time: Sun, 11 May 2025 21:53:06 +0000



Post From: ACSIL drawing vs subgraph efficiency

[2019-11-08 16:54:34]
jmt816 - Posts: 45
About to start coding a custom study to draw horizontal lines at preset levels that repeat every 100 points. Each 100 point block would have about 20 lines. Am wondering which would be the more efficient way of doing this in ACSIL: drawing the lines or using subgraphs?

I vaguely recalled seeing something somewhere in the documentation or support board, but was unable to locate this.

Thanks in advance for your guidance!