Support Board
Date/Time: Thu, 10 Oct 2024 20:02:58 +0000
Post From: Endless Message Log 'Warning'
[2013-04-11 17:03:32] |
Sierra Chart Engineering - Posts: 104368 |
We now have an idea what the problem is. This is from version 908 notes: The internal functions used by the Zig Zag study have been rewritten and now are designed to conform with the ACSIL single step intermediate study calculation function standard. There are now the sc.ZigZag and sc.ZigZag2 functions in the ACSIL (Advanced Custom Study Interface and Language) which can be used with automatic looping (sc.AutoLoop = 1) study functions. They now need to be called within the "for" loop in manual looping study functions. If your study function is using either of the prior sc.ZigZag functions, you need to update your code to conform to the standard for calling an intermediate study calculation function when calling these functions and you must recompile your study on this version or higher. Otherwise, it will not function properly.
You have a completely incorrect perception about this. At this point all of this communication in your prior message is unnecessary. From our perspective none of what you say is meaningful to us. You do not have to continually update the studies. This is almost nearly a once-in-a-lifetime type of change involving a very small part of the program. We have identified the problem and have given instructions above. Sierra Chart Support - Engineering Level Your definitive source for support. Other responses are from users. Try to keep your questions brief and to the point. Be aware of support policy: https://www.sierrachart.com/index.php?l=PostingInformation.php#GeneralInformation For the most reliable, advanced, and zero cost futures order routing, *change* to the Teton service: Sierra Chart Teton Futures Order Routing Date Time Of Last Edit: 2013-04-11 17:06:25
|