Support Board
Date/Time: Sun, 06 Jul 2025 06:26:09 +0000
Post From: sc.RecalculateChart()
[2018-07-24 18:19:07] |
kas64h - Posts: 87 |
I've been trying to use the sc.RecalculateChart(int ChartNumber) function, but without success. It looks as though the chart associated with SCStudyInterfaceRef sc is being recalculated (i.e. sc.ChartNumber), rather than the chart specified by the ChartNumber parameter. I've done several tests, and referenced the Sierra scsf_ChangeStudyInputExample example in the studies2.cpp, but the results are the same. I'm using Sierra version 1784. Thanks |