Support Board
Date/Time: Sat, 22 Nov 2025 06:14:41 +0000
Linked charts issue
View Count: 9
| [2025-11-22 01:36:31] |
| cuckiecheese - Posts: 94 |
|
Hi, I've got 6 chart tabs all linked by the same number. 5 of the charts have "days to load" linked. whenever I make a change to days to load on the unlinked chart it affects and changes all of the days to load on linked charts. This does not happen the other way around (as expected). |
To post a message in this thread, you need to log in with your Sierra Chart account:
