Login Page - Create Account

Support Board


Date/Time: Thu, 25 Apr 2024 10:20:11 +0000



How to insert new study (with new chart region) w/o re-configuring all existing studies?

View Count: 940

[2019-02-13 17:29:00]
User831301 - Posts: 4
This seems to be a basic operation but I couldn't find the answer online or in the document. Please pardon me if I missed something.

Let's say I have a chart with 4 studies open, with the symbol main price in chart region 1, and studies in chart regions 2-5. Now I want to insert a new study but I want it to display in chart region 2 by itself. Therefore, all existing studies will have to be moved to chart regions 3-6, respectively.

Currently I do this by re-configuring existing studies' Chart Region setting one by one. This becomes quite tedious when I often insert new studies, or move studies around in chart regions. I wonder if there is a more convenient way to achieve inserting and re-ordering chart regions?
[2019-02-13 18:00:41]
Sierra Chart Engineering - Posts: 104368
You do need to do it like you are. There is not an easier way.
Sierra Chart Support - Engineering Level

Your definitive source for support. Other responses are from users. Try to keep your questions brief and to the point. Be aware of support policy:
https://www.sierrachart.com/index.php?l=PostingInformation.php#GeneralInformation

For the most reliable, advanced, and zero cost futures order routing, *change* to the Teton service:
Sierra Chart Teton Futures Order Routing

To post a message in this thread, you need to log in with your Sierra Chart account:

Login

Login Page - Create Account