Support Board
Date/Time: Thu, 11 Dec 2025 23:53:34 +0000
Attach Drawing to VBP
View Count: 851
| [2017-01-30 01:12:00] |
| apollofl - Posts: 95 |
|
Can a drawing be attached to VBP valley or peak and when it changes the drawing change with it? example Horizontal Ray tool attached to a VBP valley and if the valley change, the drawing changes on that chart and any other chart that I have copy drawings from chart On. |
To post a message in this thread, you need to log in with your Sierra Chart account:
