Login Page - Create Account

Support Board


Date/Time: Fri, 03 May 2024 00:34:02 +0000



wild character for reference to a different chart for overlay studies for a study collection

View Count: 619

[2016-08-22 02:33:46]
User472677 - Posts: 316
Hello,

My main chart is a 1 minute chart with a number of studies. symbol of the chart is linked to three other charts that have different time frames such as 3 minutes, 15 minutes and tick, each with its own unique studies.

On the one minute chart some of the studies are overlays from other linked charts.

I want to duplicate this set up of group of four charts several times.

1. Is there a way to duplicate the group or do I need to duplicate one chart at a time?

2. When I duplicate, overlay studies refer to the original symbol. Of course the duplicated group has a new symbol. Obviously I can manually change the symbol reference or chart number in overlay studies. Is there a wild character or a better way so that either by duplication or by application of study collection, overlay studies AUTOMATICALLY pick up the new symbol?

Thx
[2016-08-22 10:01:28]
Sierra Chart Engineering - Posts: 104368
1. One chart at a time.

2. No.

And do not ask for new features here. It is completely pointless. We have no ability to handle these. And they would have to be chargeable even if we did. The feature requests at this point are just getting ignored.
Sierra Chart Support - Engineering Level

Your definitive source for support. Other responses are from users. Try to keep your questions brief and to the point. Be aware of support policy:
https://www.sierrachart.com/index.php?l=PostingInformation.php#GeneralInformation

For the most reliable, advanced, and zero cost futures order routing, *change* to the Teton service:
Sierra Chart Teton Futures Order Routing
Date Time Of Last Edit: 2016-08-22 10:04:02

To post a message in this thread, you need to log in with your Sierra Chart account:

Login

Login Page - Create Account