Support Board
Date/Time: Tue, 01 Jul 2025 19:19:50 +0000
Post From: IBH/IBL
[2016-04-20 16:25:45] |
User771416 - Posts: 47 |
i have an RTH chart of the ES up. i'm trying to plot the IBH and IBL. i assumed to use the High/Low for Time Period study. And that does plot the IBH and IBL. However, the line stops plotting at the 1-hour mark. i need the lines to extend right and can't see as way to make them extend. Hoping someone can tell me what i'm missing, i'm sure it's something simple.
|