Support Board
Date/Time: Sun, 18 May 2025 23:58:43 +0000
Post From: Project/Extrapolate Moving Average Into the Future
[2024-03-04 22:11:10] |
User688525 - Posts: 284 |
Hello Sierra Chart, Is there a study (or option) available to project/extrapolate a moving average "X" number of periods into the future? For example, if the moving average is 50 periods, can we project/extrapolate 50 periods (or 25 periods) into the future based on the analyzed date? If this is not natively supported by an existing study, can this be achieved with ACSIL? Thank you |