Support Board
Date/Time: Sat, 20 Dec 2025 11:33:42 +0000
Post From: Changing Days of Loaded Data Programmatically
| [2013-12-10 20:09:18] |
| Bad Dog - Posts: 17 |
|
Is there a way to change the number of days of loaded data using ACSIL? I want to load a new symbol using sc.DataFile, but I also want to change the bar time period and the number days of loaded data at the same time. -BD |
