Hi SC Engineering,

In some custom study I draw something on a chart with UseTool and set AddAsUserDrawnDrawing to true. When the chart with this study is duplicated I end up with two userdrawings on that chart. This is happening because the LineNumber for that study starts as zero on the new chart so the study draws a new drawing, and the original drawing is duplicated in the chart duplication process. The result is that I lose control of the duplicated drawing and this drawing also remains visible when the study is removed.

Any tips to manage this?