Support Board
Date/Time: Mon, 02 Feb 2026 12:26:33 +0000
Post From: UseTool drawing and duplicating chart
| [2018-05-21 13:55:39] |
| @sstfrederik - Posts: 412 |
|
Hi SC Engineering, In some custom study I draw something on a chart with UseTool and set AddAsUserDrawnDrawing to true. When the chart with this study is duplicated I end up with two userdrawings on that chart. This is happening because the LineNumber for that study starts as zero on the new chart so the study draws a new drawing, and the original drawing is duplicated in the chart duplication process. The result is that I lose control of the duplicated drawing and this drawing also remains visible when the study is removed. Any tips to manage this? Kind regards, Frederik |
