Support Board
Date/Time: Sat, 10 May 2025 00:24:46 +0000
Post From: Vertical Grid Lines
[2018-04-09 13:00:14] |
mkata - Posts: 103 |
I believe the Vertical Grid Lines need to be shifted one bar to the right. Example With the Vertical Grid Lines set to 10-bars and using 1-minute data and the bar numbering study to count every bar you can clearly see the following: The first segment of the day has 9 bars labeled 1 thru 9. The second and subsequent segments have 10 bars labeled 0 thru 9. By shifting the Grid Lines one bar to the right, every segment will have 10 bars labeled 1 thru 10. |