Support Board
Date/Time: Tue, 01 Jul 2025 16:32:18 +0000
Post From: Outside bar
[2013-08-28 06:37:29] |
Allan Stevenson - Posts: 9 |
Perfect, thanks! Using the same logic I tried to use the Line study and an alert to dynamically draw the day's midpoint. Is this not right? I get an error =H-((H-L)/2) |