Support Board
Date/Time: Tue, 28 Oct 2025 20:13:56 +0000
Post From: Outside bar
| [2013-08-28 06:37:29] |
| Allan Stevenson - Posts: 9 |
|
Perfect, thanks! Using the same logic I tried to use the Line study and an alert to dynamically draw the day's midpoint. Is this not right? I get an error =H-((H-L)/2) |
