Support Board
Date/Time: Thu, 03 Jul 2025 17:01:24 +0000
Post From: How can I draw a line at 2 months high low?
[2017-01-04 08:06:03] |
vrunrun - Posts: 53 |
I tried to plot a line showing high & low of 2 months ago (i.e. November) in a monthly chart but failed. I used the study "Period OHLC - Variable Period" with "Time Period Type" set to Months and "Time Period Length" set to 2. I can view and verify the high in the monthly chart. However, the low appeared to be the low one month ago (i.e. December low). Pls check and advise. Thx.
|